This category is for road projects which are currently being designed. This means that an engineering firm has been contracted by the Township to prepare a construction plan for the project, which must then be accepted and approved by the Township government. This is an enormously complex and intricate process, and it can take some time—usually between 3 and 6 months. However, rushed engineering plans lead to failed roads, so we want to take the time to get it right the first time. The next time we notify you about roads in this category will be when the construction contract has been sent out to bid by the Township government.
Current Roads – Engineering Design:
Billian Street
Kline Place
Morton Street
Old Farm Road
Updated 22, Sept, 2020